skip to Main Content

Local and County Sligo orders made before 12.00 pm Wednesday 21st December will be delivered before 1.00 pm on Friday 23rd December. All nationwide orders made before midnight on Monday 19th December will be dispatched prior to Christmas. All orders made after that will be processed from 3rd January onwards. Happy Christmas!

Free Delivery over €150

Excluding Bulk Delivery

100% Irish Business

Trading in Ireland since 1870.

Trade Discounts available

Save money & time

Heat Hero Gravity Heating System

285.00 (Inc. VAT)

Delivery time: 1-2 Days
Rated 0 out of 5
(be the first to review)

Gravity Heating System from Heat Hero
Key features:

  • The most efficient way to get your solid fuel boiler to heat your radiators and domestic hot water
  • Recommended by the major solid fuel boiler manufacturers
  • Easily installed
  • Suitable for both new and existing heating systems

3 in stock

Brand:Heat Hero

Product Description

Heat Hero Gravity is the most efficient way to get your solid fuel boiler to heat your radiators and domestic hot water. This award winning product is recommended by the major solid fuel boiler manufacturers and is suitable for both new and existing heating systems.

It is easy to install and once in place it helps get improved heat to your radiators, more hot water and ultimately you burn less fuel and thus save on energy costs. This is an open vented gravity fully pumped heating system and is tried and trusted by Plumbing professionals throughout Ireland. It has shown to improve efficiency of heating systems by up to 80% and help save users up to 50% on their fuel.

It is compatible with dual heating systems.

How does Heat Hero Gravity work?

The solid fuel heating system is typically used with a gravity feed circuit to the hot water cylinder, with a vent or overflow to prevent excess pressure build up in the solid fuel heating system.  Heat Hero is fully safe and does not stop or restrict  the gravity feed circuit. There are no moving parts or electrical components in the Heat Hero manifolds so no maintenance is ever needed.


Using this with a Solid Fuel Stove with boiler:

A solid fuel stove boiler can achieve twice the heat of an oil/gas boiler but will not turn off a thermostat and wait for a circulating pump to take away the heat.

Efficiency can only be achieved by strong circulation through the solid fuel boiler. This is not possible when a vent is installed in front of the circulating pump or a heat exchanger is installed on the solid fuel stove boiler.

Heat Hero solves this problem and allows you to get full efficiency from your stove boiler.

Heat Hero working on gravity:

 

Heat Hero Gravity with Dual Heating System:


Heat Hero Gravity is the only safe, open vented, gravity, fully pumped, pressurised solid fuel heating system on the market. Heat Hero Gravity also improves Oil/Gas Boiler efficiency in a dual heating system. When linking up a Solid Fuel Boiler with an Oil or Gas system it is very important to have pressure. Heat Hero is the only heating system that can create approximately 0.7 bar of pressure throughout the whole heating system.

Heat Hero creates strong circulation which heats the water in your solid fuel boiler more often and gives a much better transfer of heat to the radiators, hot water, room heat and you won’t burn as much fuel.

Heat Hero can improve the efficiency of your whole heating system by up to 50%. Heat Hero is an award winning Solid Fuel Heating System and was commended ‘Best Innovative Product’ by SEAI at The Energy Show 2016. Major Stove Manufacturers recommend Heat Hero now because it makes solid fuel heating systems more efficient which means your Stove, Cooker or Back-boilers can perform to its maximum efficiency.

Heat Hero Gravity and Heat Hero Free Flow Zoning Centre:

Heat Hero Gravity and Heat Hero Free Flow Zoning Centre

Heat Hero Gravity with a High Pressurised Gas Boiler:

Heat Hero Gravity with a High Pressurised Gas Boiler
Using Heat Hero Gravity a solid fuel boiler can be connected efficiently to a high pressure gas boiler by installing a heat exchanger on the gas boiler. This will allow the solid fuel boiler witch is a non-controllable heat source to circulate the water directly from the stove to the radiators or under floor heating. This is the most efficient way to connect a solid fuel boiler to a high pressure gas boiler.

You can see the Technical Manual here.

Reviews

There are no reviews yet.

Leave a customer review

Your email address will not be published. Required fields are marked *

Delivery charge information:

You can add any and all products to the basket and calculate your delivery charges easily. Simply enter your Eir Code and all applicable charges will be calculated automatically.

  • Orders of €150 inc VAT or over will get free delivery nationwide. (Please see notes below for exceptions)
  • All orders under €150 inc VAT incur a standard delivery charge of €10 including VAT
  • (Please see below for exceptions)
  • We deliver to anywhere in Ireland.

Bulky items:

Bulky items may incur delivery surcharges (see below) as extra courier costs unfortunately are often unavoidable. If the order is over €150 only the bulk delivery charge will apply. The final delivery charge for bulky products will be calculated when all items have been added to the shopping cart.
All efforts are made to indicate where products are subject to delivery surcharges.

Special Order items:

We are in regular contact with our suppliers and we try our best to make sure that all “special order items” on our webstore are available from our suppliers within the timeframe advertised. If, for some reason our supplier is out of stock and you have ordered the product we will let you know immediately and give you the option to either wait until it’s back in, upgrade to a better model at little or no extra cost or receive a full refund. See more info on Special Order products here.

Timeframe:

All nationwide deliveries will be delivered within 2-3 working days.

(Local deliveries within 1-2 working days.)

Special order items may take longer to deliver but this will be indicated on the product information page. You can see more info on Special Order products here.

Working days are Monday through Friday excluding public holidays. Orders placed on Saturday/Sunday will be deemed as being placed on the following Monday.

Some items may take longer to ship. If this is the case, we will notify you by phone/email of this delay.

If your delivery is urgent please contact us by phone or email and we will do our best to expedite it.

Please indicate on your order any specific delivery instructions.

Bulky goods:

Bulky goods will be delivered on pallets and will be unloaded by the courier. All bulky goods are delivered kerbside. Unfortunately, the delivery company will not convey the goods into premises for storage unless agreed in advance. Access to the delivery location must be suitable for a truck and failure to provide suitable level ground for operating pallet truck may result in refusal to deliver by the courier. Please note delivery operators will apply safe procedures in relation to ongoing Public Health considerations..

Exceptional Goods:

Some building materials are extremely bulky and not practical to deliver outside Co. Sligo e.g. concrete blocks, tonne bags of sand or gravel or some lengths of timber. We have highlighted where this is the case in bold red writing. If you do order these products we will contact you to see if you want to pay an additional delivery charge or if you wish to cancel the order. Please do not take offence to this as some bulky goods may cost much more to deliver than the value of the goods. We are based in Sligo so can offer a local delivery service in this area using our own vehicles.

If there is a forklift or teleporter available onsite, we would appreciate if you could tell us in advance by filling out the special delivery notes when completing the order.

The Seller or the courier company will not be held responsible for any damage to goods or persons caused by the goods being unloaded by the buyer.

**Please contact us in advance of ordering if unsure of the above**

Damaged goods:

Where goods are damaged on delivery the Buyer has the right to refuse delivery. Damaged goods should be photographed on delivery and photos emailed to sales@mybuildingsupplies.ie straight away. If goods are damaged on delivery, we will replace the goods in as timely a manner as possible at no extra cost.

Once the goods are signed for it will be deemed that goods were in good state when delivered.

General:

Delivery shall be within a time period agreed between the Buyer and Seller and the Seller shall use its best endeavours to ensure that delivery takes place within the period agreed. Failure by the Seller to deliver the Goods within the agreed time period shall not amount to a breach of this contract by the Seller and the Buyer shall not be entitled to damages or other compensation or to cancel this contact by reason of such failure.

The Seller reserves the right to deliver in instalments. Each part delivery shall be deemed to constitute a separate contract, the fulfilment or non-fulfilment of which shall not affect any other part of the contract or the contract as a whole. Where any order involves more than one delivery and default is made on payment on the due date (either under this contract or any other contract made between the Seller and the Buyer) the Seller shall have the right to suspend all further deliveries until payment is made or to terminate the contract without prejudice to any existing claim.

The Seller shall not be liable to the Buyer for any loss or damage which may be suffered by the Buyer as a direct or indirect result of the supply of the Goods by the Seller being prevented, hindered or delayed by reason of any circumstances whatsoever which are outside the control of the Seller. Once delivery has been accepted the Buyer shall not be entitled to withhold or postpone payment of all or any portion of the price agreed, therefore.

1. Where goods are damaged on delivery the Buyer has the right to refuse delivery. Damaged goods should be photographed on delivery and photos emailed to sales@mybuildingsupplies.ie. If goods are damaged on delivery, we will replace the goods in as timely a manner as possible at no extra cost.

2.  If goods are signed for and later found to be faulty/damaged, notice must be given in writing within 24 hours and photos will be required to be emailed to sales@mybuildingsupplies.ie.

3. All faulty/damaged goods issues will be dealt with on a case by case basis and best endeavours will be made to rectify within a timely manner. Manufacturers’ warranties will apply in certain cases.

4. Any returned items which are not faulty or damaged will incur full carriage costs which must be paid for by the customer.  Notice of intention to return unwanted goods must be given within 14 days of receiving goods. Returned goods must be in original packaging and in original condition before refunds can be given.

5. All returned goods to be sent to Patrick Rogers Ltd., O’Connell St., Ballymote, Co. Sligo

Note regarding Oil Boilers and Boiler stoves:

Please ensure you check with us first or consult a qualified professional before ordering your oil boiler or boiler stove to ensure you order the correct one for your home. If the product needs to be returned a restocking fee may apply.

Returns of Special Order Items

All “special order items” are subject to the same product returns policy as stocked items. However, items which are returned that are not faulty or damaged on delivery will be subject to a 10% restocking fee.

X